
Create a versioned technical pack
Include drawings, size measurements, fabrics, trims, construction details, labels and packing. Mark revisions clearly and identify the document version that each supplier is quoting.
Confirm rights and responsibilities
Clarify ownership of designs, trademarks and any supplied patterns. Use your own or authorised assets. Agree whether the factory may subcontract operations and how that will be disclosed.
Approve the right sample
Decide which samples are needed for development, fit, materials and pre-production approval. Record comments against measurable criteria and retain the final approved reference.
Plan material and change control
Define what happens if the agreed material, trim or colour becomes unavailable. Substitutions should be approved before use, with any cost, timing and quality implications made explicit.
Inspect against the approved reference
Check agreed measurements, workmanship, quantities and packaging. For a new supplier or design, a pilot order can reveal practical issues before a larger production commitment.
We agree the scope, cost and timeline before starting.